Buildings: Sanctuary, Chapel, and Administration
Building Owner: East Liberty Presbyterian Church
Location: 116 S. Highlands Avenue Pittsburgh, PA
Building Size: 163,715 GSF
Building Type: Worship Facility and Office

East Liberty Presbyterian Church - 5 Yr. Energy Metrics Summary
2016 Quarterly Totals2015 Totals2014 Totals2013 Totals2012 Totals
Energy Star Score7469727780
Site EUI72.583.68271.165.4kBtu/Sf/Yr
Source EUI92.1103.8102.893.587.7kBtu/Sf/Yr
Greenhouse Gas Emissions815.9912.1906.8836789CO2e/Yr
Total Utilities Cost$ 100,775$ 101.264$ 154,354$ 139,317.57$ 134,915.26Cost
East Liberty Presbyterian Church - 5 Yr. Utilities Summary
2016 Quarterly Totals2015 Totals2014 Totals2013 Totals2012 Totals
Duquesne Light – Electric123,200367,120384,160
431,440436,640Units (KwH)
$ 13,566$ 40,545$ 29,640.10$ 38,612.55$ 45,936.63Cost
Equitable Gas – Gas5,02512,11811,8079,911.608,979.80Units (MCF)
$ 31,450$ 60,719$ 104,334.52$ 86,326.00$ 73,304.17Cost
PWSA – Water101,000464,000644,000734,000837,000Unit (Gallons)
$ 2,616($ 705)$ 12,980.66$ 14,379.02$ 15,674.46Cost

5 Year Utility Information

Model Baseline Simulation

76

Estimated Site EUI

Schematic System Design – Concept 1a – 65 ton Multistack

66.2

Estimated Site EUI

Schematic System Design – Concept 1b – 40 ton Multistack

66

Estimated Site EUI

Concept 1b – Simulation Data

Schematic System Design – Concept 2 – 50 Ton DOAS

58.6

Estimated Site EUI

Concept 2 – Simulation Data

Existing Drawings and Documentation